CONSTRUCTION

ACI Construction Company Limited Is a Professional Design Unit & Complete Construction of Construction Works, Interior Works.

Prologue, ACI would like to share with you the main steps to build a Project including::

  • Step 1: Customers planning to build a project.
  • Step 2: Choose a Design Consultant.
  • Step 3: Choose a Construction unit.
  • Step 4: Finshing the construction.

Current trend, Customers often choose Design Units & Package Construction. Because, When Designing & Package Construction. Usually the Contractors will know the Design Documents. From there, it is convenient to ensure quality construction, Aesthetics for the Building.

Construction is one of the areas of operation of ACI Construction Co., Ltd

In this post, ACI will present about “Construction”:

  • What is Construction Construction??
  • Construction Bidding Process.
  • Construction Process.
  • Construction Quotation.
  • Why choose ACI Construction Co., Ltd as the “Construction Construction” Unit for YOUR Project?

Please see below for more details !

1) WHAT IS CONSTRUCTION CONSTRUCTION??

Construction is a process of using: Design Profile, Construction profile, Building materials, Human labor power, Specialized machinery and equipment, …to create a realistic Finished Works.

Construction work includes: Building, interior installation – Exterior for new construction. Repair, Renovations, restore old works. Maintenance of construction works. To move, Demolition of expired works.

2) CONSTRUCTION BIDDING PROCESS

When looking at the Design Profile, We can imagine the grandeur and beauty of the Project after it is completed.

However, in order to "transform" a Building located on “papers” become a Construction “reality” can be observed directly with the eyes, touch with hand, feel with other senses, … is not a simple thing.

So, stage of selecting the Construction Unit (Contractors) reputation, Being qualified to execute the Works is an extremely important step.

To select a Contractor, the Investor (Client) will Procurement organization.

Hereafter ACI Construction Company Limited as a Contractor, Please share with customers “Bidding Process” as follows:

Bidding Diagram

Stage 1: Making Construction Bid Documents

Contractor after receiving the Letter of Invitation and Full Design Profile (Full) from Customer. Bidding documents will be prepared including: Business license, Capacity profile, Construction contract, Personnel Organization Chart, Construction Progress Table, Quotation.

Note: In the process of preparing the Construction Bid. The Contractor should carefully study the Invitation Letter, Design Profile, Survey the current status of the construction site, …

Stage 2: Submit to Customers & Adjust (If any)

The Contractor sends the Construction Bid to the Client and waits for the Client to approve the Tender..

If there is a request for adjustment from the Customer, the Contractor will negotiate and adjust the requirements to the reasonable extent..

Stage 3: Sign Construction Contract

When being notified by the Customer of winning the bid. The two parties will sign a Construction Contract.

Information about the parties, Contract value, Terms of acceptance, Terms of payment, Responsibilities of the parties, … will be detailed in the Construction Contract.

3) CONSTRUCTION PROCESS

For the Project to have a quality construction process, The least error occurs. Then there should be a Construction process clear, rigid.

ACI Construction Company Limited uses the Network Button Construction Diagram to go up "Construction process" Construction.

Construction Diagram of Network Nodes, also known as “Network Diagram Method” Directed Graph method is applied (network structure) into the algorithms to Schedule and Organize the Construction.

In each Network button will contain information such as: Numerical order, Job name, Amount of work, Number of employees, Number of equipment and machines, Completion time.

Connection arrows between Network Nodes show traction (necklace) of the Works.

In the Network Node Construction Diagram. We use Gloves – Gantt to control the construction progress of the Works.

In addition, we also apply the Oblique Progress chart, Horizontal Progress, Vertical Progress to optimize Network Node Construction Diagram.

 

Network Node Construction Diagram

Go on bussiness 1: Preparation

  • Prepare surface: Check, measure, nail cup (locate).
  • Prepare construction documents: From Design Profile, Permission drawing. We will make construction documents and submit them to customers for approval. Construction documents include (construction drawings, construction progress table, personnel organization chart, construction material statistics table).
  • Material sample preparation: We will prepare Material Samples, Model (necessary) and submit to Customer for approval.
  • Preparing for Construction: We bring Construction Manpower, Equipment, Machines, Materials on the Site and ready for construction.

The more complete the initial preparation, Careful, it will help the construction go smoothly.

Go on bussiness 2: Underground Construction

  • Foundation construction, Abstained: Dig, Concrete lining, Install formwork, Reinforcing steel, Pouring a concrete foundation, Remove formwork. If it is a pile foundation, there is more pile driving work, pile, …
  • Basement Construction (if any): Similar to the steps of foundation construction. Also need to use "Pushing" if necessary.
  • Construction of MEP . System: Are high-level jobs, drainage for the underground part (septic tank, pipeline, …). Works on subways, ventilation (if any), …

During the construction of the Underground, We will organize acceptance test with Customers in important works such as Rebar, Put concrete, MEP.

When completing the construction of the Underground part, We will organize the acceptance of Underground Works with Customers. Then will proceed to fill the soil, Leveling the ground to prepare for the Body Construction work.

Go on bussiness 3: Body Construction

  • Column Construction: Install formwork, Reinforcing steel, Concreting, Remove formwork. If it is a pre-engineered steel column, it will be replaced with Column installation.
  • Construction of Beams: Scaffolding installation – formwork, Reinforcing steel, Concreting, Remove formwork. If it is a pre-engineered steel beam, it will be replaced by the installation of the beam.
  • Floor Construction: Scaffolding installation – formwork, Reinforcing steel, Concreting, Remove formwork. If the Floor is pre-installed panels, it will be replaced by Floor installation.
  • Construction of Stairs (if any): Scaffolding installation – formwork, Reinforcing steel, Concreting, Remove formwork. If it is a prefabricated Stair, it will be replaced with the installation of Stairs.
  • Construction of Walls, Wall, Doors: Wall refers to the load-bearing wall (like BTC, …) construction process will be like Column, Beams, Floor. The wall is the cover wall, Wall. Walls are usually built of baked bricks, ACC bricks or prefabricated partitions. During the construction of the Wall, it is combined with the construction of the Gate (including linen, couch if available).
  • Construction of MEP: Combined with the construction of the underground part, body part, roof part. Will combine with the construction of MEP (electricity, water, air conditioner, Firefighting, …).

During the construction of the Body, We will organize acceptance test with Customers in important works such as Rebar, Concreting, pipe system, wire of MEP, device placement, …

When completing the construction of the Body, We will organize the acceptance test of the construction of the Body with customers.

Note: The work of dismantling the formwork must ensure that the concrete has the correct age according to TCVN.

Go on bussiness 4: Roof Construction

  • Reinforced concrete roof: Similar to floor construction
  • Roof truss + roof tiles: Construction of truss, roof tile construction
  • Roof truss + roofing: Construction of truss, corrugated iron roofing construction
  • Decorative roof: The main function of the Roof is to cover the building. In addition to increase aesthetics and meet the love of design, We will complete the roof decoration according to the design documents. Roof decoration like decorative tile stickers, sigh only, reliefs, …

Currently on the market there are some new types of roofs such as prefabricated panels, bitumen tile, … the construction method is similar to the types of roofs we introduced above.

It is important in the construction of the roof to be able to cover the work and meet the drainage slope that meets TCVN.

During the construction of the roof, We will organize acceptance test with Customers in important works such as Rebar, Concreting, pipe system, wire of MEP, device placement, …

When the roof construction is completed, We will organize the acceptance test of the roof work with customers.

Note:

The work of dismantling the formwork must ensure that the concrete has the correct age according to TCVN.

Construction of Exterior and Interior Construction: Building Toto is the finishing process (rough) for the Construction has completed the rough construction. Use on-site mixed bowl mortar or ready-mixed bowl mortar (skimcoat) for construction.

Go on bussiness 5: Construction Finishing Tran

After completing the construction work, We will carry out the construction of Finishing the ceiling like: plaster ceiling, decorative ceiling types, sigh only, reliefs, …according to the design.

Go on bussiness 6: Wall Finishing Construction

Carrying out construction Finishing the wall such as: Wall decorations, sigh only, reliefs, …

Go on bussiness 7: Floor Finishing Construction

Carrying out the construction Finishing the floor as: Brick floor, wood floor, decorative stone floor, skirting wool, threshold, …

Go on bussiness 8: Construction and Installation of Equipment

Carrying out the construction and installation of equipment:

  • Door Installation, Lan Can: Covered door, Room divider door, Handrail, Balcony, …
  • Furniture installation: Table, Chair, Cabinet, Bed, …
  • Installation of MEP . equipment: Lights, Decorative lights, Switch, Sockets, TV, Fridge, Kitchen equipment, Sanitary equipment, …

Go on bussiness 9: Rough Industrial Hygiene (VSCN 1)

Cleaning the whole building, clean up the dirt. As a preliminary cleaning part, clean enough to carry out inspection and treatment of defects in Finishing Works.

Go on bussiness 10: Inspection & Handle

Finished raw VSCN, We will check with the Customer for defects (if any) in the section Finishing the Works. Then proceed to deal with the defects (if any) for the Project to ensure the quality, Beauty.

Go on bussiness 11: Fine Industrial Hygiene (VSCN 2)

After completing the inspection and handling of defects (if any). We will carry out cleaning of the entire Building for the first time 2. Ensure the Project is clean and ready to be handed over to the Client

Go on bussiness 12: Handover of Works

After the Project is ready for handover to the Client.

We will organize the acceptance test to complete and hand over the Project to the Customer.

Handing over the Project is our most important and happiest step. And our goal is to transmit happiness That goes to the Customer.

Glove Road Concept (Gantt):

On the diagram, The Glove Line is indicated by prominent red arrows.

We detail the Works (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12) are the Works located on the Ganges Road (Gantt).

Gloves Road (English is Critical Path) is the shortest time (maybe) to complete Construction.

During construction, We always strictly control the Gangway to ensure the construction progress.

The works that are not on the Ganges Road are the jobs that can be moved depending on the actual construction.

In reality, It is inevitable that problems may arise, affect the completion progress of the Works. Flexible use of Network Node Diagram, Controlling the Glove Road and flexibly deploying the works that do not belong to the Glove Road will help us handle well the problems that may occur during the Construction process..

Above, is the Construction Process that We apply to a Project built from A – Z. Include: Rough construction, Complete construction, Interior construction.

4) PRICE CONSTRUCTION CONSTRUCTION

Information about quotation, We present in the section “QUOTE”

Customers can refer to the link: https://acicons.vn/bao-gia/

Why choose ACI Construction Co., Ltd as a unit? “Construction” for YOUR Project?

Construction Company Limited is a professional unit of Design & Package Construction of Construction Works, Interior Works.

We have Professional Process, clearly about: Design consultancy, Construction, Interior Construction, Project management, Guarantee – Building Maintenance.

Our slogan is: Quality Works – Make believe

We are free 100% design costs, Cost of Building Permit, Refund cost. In case the Customer chooses ACI Construction Co., Ltd as the unit of Design and Construction Package of the Works.

The Projects We Perform, include: Villa, Townhouse, Hotel, Restaurant, Office, …

We have been building trust with customers by building the best quality works, Ensure optimum usability, follow the Design Profile.

Our staffs are: Architect, Engineer with good professional knowledge, Well-training worker.

We are experienced in Design & Package Construction.

We always put our whole heart into each Project.

In addition, we also apply modern machinery and equipment to work to improve quality, shorten the construction progress.

We build quality works, durable with time. Bring the most satisfaction to customers.